about Asphalt Mixing Plant
How long is needed for installation working of one set asphalt mixing plant?
20-30 working days for batch asphalt mixing plant, and 10-20 working days for continuous(drum) asphalt mixing plant.
How many person are needed for the operation of whole asphalt mixing plant ?
Six persons
How long is the service life of your asphalt mixing plant ?
Normally, the service life of our batch asphalt mixing plant is over 15 years, and it of our continuous (drum) asphalt mixing plant is over 10 years.
How about the quality guarantee period of your asphalt mixing plant ?
The guarantee period of our asphalt mixing plan is 15 months, we will bear the quality issue of all parts except wearing parts in guarantee period.
How about the spare parts supply of your company?
We will provide some wearing parts along with whole asphalt mixing plant to user freely, and user can purchase more wearing parts along with whole asphalt mixing plant.
We will keep the spare parts supply to user in the whole service life of asphalt mixing plant.


about Concrete Batching Plant
What ore raw materials can your mining crushing production line process?
It can process most non-metallic and metallic ores such as granite, limestone, marble, basalt, iron ore, etc. The production line configuration can be customized according to the hardness of the raw materials (Mohs hardness level 1-10).
How do we determine the production line capacity suitable for our mine?
This requires a combination of three core factors: ① planned daily output (e.g., 500t/d, 1000t/d); ② raw material particle size (maximum feed size); and ③ finished product particle size requirements (e.g., 0-5mm, 5-10mm aggregate). We can provide a free capacity calculation solution.
How long does it take to install and debug the production line?
For a standard production capacity (500-2000t/d) production line, the on-site installation period is approximately 30-45 days; the commissioning period is 7-10 days. We will send professional engineers to provide on-site guidance to ensure smooth commissioning.
How long is the replacement cycle of wearing parts (such as hammer heads and liners) during production line operation?
Depending on the hardness of the raw material, the lifespan of consumable parts is 1-3 months (e.g., approximately 2-3 months for limestone and approximately 1 month for granite). We will provide some consumable parts along with the entire crushing line free of charge. You can purchase additional consumable parts along with the entire crushing line.We will provide spare parts throughout the lifespan of the crushing line.
about Mining crushing production line
What factors affect the production efficiency of a concrete batching plant?
Key factors include the matching degree of equipment components (e.g., mixer & aggregate feeder), raw material supply stability, and operator proficiency.
How often should the concrete mixer be maintained to ensure safety?
Conduct daily inspections (checking lubrication & fasteners) and comprehensive maintenance every 300-500 working hours. Replace worn parts (e.g., mixing blades) promptly.
How to choose the right capacity of a concrete batching plant for a construction project?
Calculate based on the daily concrete demand of the project and reserve 10%-20% capacity margin to cope with peak construction periods.
What environmental protection measures should be taken for a concrete batching plant?
· Install dust collectors for aggregate bins and powder silos.
· Equip sewage recycling systems to treat and reuse washing water.
· Use noise reduction enclosures for mixers and fans.


about After-sales service
How about the after sales service of your company ?hing plant?
We will send professional technical staff to user’s project working site to guide installing work, and commissioning the plant and training the operators of the buyer. And BONTOP provide the technical support service to user’s within the whole service life of asphalt mixing plant.
OUR SERVICES
BONTOP SERVICE
Perfect sales service system and all-round service network are the guarantee of BONTOP to provide quality services. Product sales, technical service, hotline, promotion and after-sales service are mainly done by customer service department as complementary platform and by all levels service team.
Pre-sale Service
We can customize project design and process design for you, produce machinery and equipment procurement plans suitable for you, and design and manufacture products according to your special needs.
Sales Service
Accompany you to complete the equipment acceptance, and assist in the preparation of construction plans and detailed procedures.
Technical Support and Training
Our after-sales team would follow up the whole process, from transport, foundation treatment ,installation,debugging,staff training, technical support to spare parts supply. After you purchased whether our whole asphalt plants or just auxiliary, we would supply regular technical support and training according to the actual situation of our asphalt mixing plant.
CONTACT US
Moving forward, BONTOP Machinery will continue to be driven by technological innovation, striving to build a globally renowned road construction machinery brand—BONTOP—and contribute to the infrastructure development of even more countries and regions.